Preliminary assessment of the impact of Wrocławski bridge in GLiwice on flood flow in Kłodnica river
More details
Hide details
1
Kozmik Projekt Bartłomiej Mikołajczyk
ul. Chopina 6, 44-100 Gliwice
2
Uniwersytet Rolniczy w Krakowie
Katedra Inżynierii Wodnej i Geotechniki
Publication date: 2019-12-31
Corresponding author
Bogusław Michalec
Prof. dr hab. inż. Bogusław Michalec
Uniwersytet Rolniczy w Krakowie
Katedra Inżynierii Wodnej i Geotechniki
Geomatics, Landmanagement and Landscape 2019;(4)
KEYWORDS
ABSTRACT
In this work, a preliminary assessment has been made of the impact that the bridge along
Wrocławska and Częstochowska streets has on the conditions of flood flow. Calculations were
made for a flow with a probability of exceedance p = 1% amounting to 100 m3 · s–1. Based on
the field tests performed in the designated section of the Kłodnica river from km 49 + 799 to
km 49 + 739, i.e. geodetic measurements of the Kłodnica riverbed and technical inventory of
the analysed bridge object, a digital terrain model (NMT) was developed, followed by hydraulic
calculations of the water flow Q1% and the flow accumulation (damming) in the clear span of
the Wrocławski bridge. The accumulation height was calculated using the formula given in the
study by Bajkowski et al. [2000]. Calculations of the accumulation height of designed flow in
the clear span of the bridge were also made using the HEC-RAS program. The calculations were
made in two variants – in the first variant, calculations were performed for the selected section
of Kłodnica without a bridge, and in the second variant, with the bridge. The so-called clear span
reserve (bridge clearance) was also calculated, computed as the difference in ordinates of the
keystone arch of the bridge span and the stacked water table of the design flow in the bridge clear
span. The obtained calculation results indicate no risk of Q1% flow accumulation in the cross-
section of the Wrocławski bridge. The calculated accumulation of the design flow will not cause
flooding from the Kłodnica riverbed. Preliminary conclusions indicate a possible necessity to
verify flood hazard zones for the flow with a probability of exceedance p = 1%, developed for the
Kłodnica river in the centre of Gliwice town, developed as part of the ISOK project.