Analysis of the sewage system expandability in Mściwojów commune
More details
Hide details
1
Uniwersytet Rolniczy w Krakowie
Katedra Inżynierii Sanitarnej i Gospodarki Wodnej, Poland
Publication date: 2013-06-30
Geomatics, Landmanagement and Landscape 2013;(2)
KEYWORDS
ABSTRACT
The aim of the study is to analyze the hydraulic conditions of the existing sewage system
and the sewage treatment plant in the commune of Mściwojów. This is in relation to the
aspect of connecting new buildings, as a part of the investments in the pilot project VITAL
LANDSCAPES no. 2CE164P3. The analysis led to the conclusion that an increased wastewater
inflow from the new buildings is manageable. The current capacity of the sewage treatment
plant will be increased by 3 to 5%, which will not affect the stability of the existing treatment
process. The hydraulic analysis of the sewer network proved that the existing sewer collectors
can handle the increased flow.